Porthcawl Regeneration

Development Framework & Master Plan

CDN Planning headed a team of consultants in 2003-04 appointed to produce a regeneration strategy for a 100-acre sea front site in Porthcawl. In 2006-07, CDN Planning was part of the team to update that document so that it could be adopted as Supplementary Planning Guidance by Bridgend County Borough Council.

CDN Planning with Halcrow prepared a regeneration framework for Porthcawl, which included a Master Plan for up to 1350 residential units along with new commercial and leisure development. The project’s main objective was to revitalise this coastal town in South Wales, regenerating the existing harbour and introduce a new waterfront promenade linking the existing town centre in the west to Trecco Bay to the east.

Porthcawl Regeneration

Porthcawl Regeneration